Staff Sign-Off Sheet (LLS)
From Physics 111-Lab Wiki
All pages in this lab
I. Low Light Signal Measurements
II. LLS Pre Lab Questions and Staff Sign Off Sheets...PRINT, FILL THIS OUT, get it signed, and Turn it in with your report.
III. Introduction to Equipment (LLS)
V. Measuring the Light Signal from a Diode
VI. All Appendices A, B, C, D, E, Read These]]
VII. Appendix A: SR760 FFT Interface Program
VIII. Appendix B: SR830 Lock-In Interface Program
IX. Appendix C: the Remote Control Box
X. Appendix D: the Phase Sensitive (Lock-In) Detector
XI. Appendix E: Interpreting the Data Sheet for the LED
Before The Lab
View the Low Light Signal video,discuss the pre-lab questions with an instructor, and get the Staff Sign-Off Sheet (LLS) signed.
View the Low Light Signal video.
It is your responsibility to discuss this lab with an instructor on the first day of your scheduled laboratory period.
