Staff Sign-Off Sheet (LLS)

From Physics 111-Lab Wiki

Jump to: navigation, search

All pages in this lab

I. Low Light Signal Measurements

II. LLS Pre Lab Questions and Staff Sign Off Sheets...PRINT, FILL THIS OUT, get it signed, and Turn it in with your report.

III. Introduction to Equipment (LLS)

IV. Introduction to Noise

V. Measuring the Light Signal from a Diode


VI. All Appendices A, B, C, D, E, Read These]]

VII. Appendix A: SR760 FFT Interface Program

VIII. Appendix B: SR830 Lock-In Interface Program

IX. Appendix C: the Remote Control Box

X. Appendix D: the Phase Sensitive (Lock-In) Detector

XI. Appendix E: Interpreting the Data Sheet for the LED


Before The Lab

View the Low Light Signal video,discuss the pre-lab questions with an instructor, and get the Staff Sign-Off Sheet (LLS) signed.


View the Low Light Signal video.

It is your responsibility to discuss this lab with an instructor on the first day of your scheduled laboratory period.

Personal tools